杞县

Dayan Ditch treatment project in Qixian County, Kaifeng City, Henan Province - Announcement of results

Post time: 2024-02-08 11:44:33 Number of page views: Author: Kaifeng Public resources trading information Network

Henan Kaifeng city Qixian Dayan ditch control project

Result announcement

Entrusted by the Construction Administration of Qi County Small and medium-sized River Management Project, Xintou Weihua Enterprise Management (Henan) Co., LTD., conducted a public tender for the Dayan Ditch management project in Qi County, Kaifeng City, Henan Province20240131Bid evaluation activities were carried out in Qixian Public Resources Trading Center in accordance with the law。After the expiration of the period of publicity of the candidates, the bidding committee shall, in accordance with the principles, methods and procedures of the bidding20240207The calibration was carried out by checking random method in the calibration room of Qixian Public Resources Trading Center。The bidding results are now announced as follows:

1. Description of the bidding project

1Project name: Dayan Ditch management project in Qixian County, Kaifeng City, Henan Province

2Project number: Bianqi tendering and procurement-2024-1

3Source of funds: financial funds

4, total investment:17622422.70

5Construction site: Qixian County, Kaifeng City

6Division of bid section: This tender7section

Section 1: Pile number10+992~11+664Riverbank protection project, reconstruction of Weizhuang South Bridge, river construction waste removal。

Section 2: Pile number10+232~10+992Revetment project, reconstruction of Sunzhuang South Bridge, river construction waste removal。

Section 3: soil dredging6+610~10+232Reconstruction of Guozhuang South Bridge, reconstruction of Guozhuang Southeast Bridge, new Huanggang West Bridge, river construction waste removal。

Section 4:6+142~6+610Revetment project, reconstruction of Huanggang South Bridge, river construction waste removal。

Section 5: Earth dredging (0+00~6+142New Zhuanglin village flood sluice, rebuild Lufang village1Bridge, new furnace house village2桥。

Section 6: Rebuild Liangzhuang control Gate, rebuild Lufang village3桥。

Section 7: Project supervision

7Bidding scope: Sections 1 to 6: bidding quantity list, construction drawings (including changes in drawings) and all contents contained in the bidding documents;

Section 7: Supervision in the whole construction process and warranty process;

8Planned construction period: Sections 1 to 6:180Calendar day

Supervision service period: with the construction period and defect liability period

9, quality requirements: qualified;

10Determining the winning bidder: This project adopts the evaluation separation method to determine the winning bidder。

2. Qualification requirements

2.1Qualification requirements for the first to sixth bidding sections:

2.1.1The bidder has the ability to independently bear civil liability, has an independent legal personality, and has a legal and effective business license with three certificates in one。

2.1.2The bidder shall have Grade II or above qualification for general contracting of water conservancy and hydropower engineering construction, have valid safety production license, and have corresponding construction ability in personnel, equipment, capital and other aspects。

2.1.3The bidder has a good track record of paying taxes and social security funds in accordance with the law (provided near20231Tax payment and social security fund vouchers for three consecutive months since October)。

2.1.4Project manager (construction engineer, the same below) qualification: The proposed project manager shall have the qualification of a registered construction engineer of hydropower engineering level II or above, and hold a valid production safety assessment certificate issued by the provincial and above water conservancy administrative department (excluding temporary), and have not served as the project manager of other construction projects under construction。

2.1.5The technical leader of the project to be assigned shall have the intermediate or above technical title of the relevant professional。

2.1.6The person in charge of the enterprise, the project manager and the full-time safety officer shall obtain the valid safety production assessment certificate issued by the water conservancy administrative department。The bidding enterprise and its related (subordinate) personnel (including project managers, technical leaders, full-time security officers and authorized clients) to be invested in the project shall disclose information on the water conservancy construction market supervision platform (subject to online publicity, provide webpage screenshots and stamp the official seal of the bidder);

2.1.7The project manager, technical leader, authorized client, safety officer and other key project personnel to be assigned by the bidder shall be employees of the unit and shall be provided20231Social security certificate for three consecutive months since October, and has a valid labor contract。(Provide the screenshot of the inquiry website and the inquiry method, the newly hired personnel shall be counted from the date of appointment, and the issue time shall not be earlier than the announcement time);If the company does not participate in social insurance, once verified, it will be disqualified from bidding。

2.2Section 7 Qualification requirements:

2.2.1The bidder has the ability to independently bear civil liability, has an independent legal personality, and has a legal and effective three-in-one business license。

2.2.2Qualification: The bidder shall have Grade B or above qualification of water conservancy project construction supervision, and have corresponding supervision ability in personnel, equipment, funds, etc.;

2.2.3Project Director qualification: The chief supervision engineer of the proposed project shall have the qualification of registered hydraulic engineering supervision engineer and have senior professional and technical title of engineering, and shall not be held As the project director of other construction projects under construction, the bidder shall issue a no-construction commitment letter。If the contract project undertaken by the contract project has been completed or the change procedures are complete and other conditions meet the requirements, the corresponding certification materials shall be provided in the bidding documents, which can be regarded as no project under construction。

2.2.4The authorized client and its main construction personnel (including the project director and professional supervision engineer) shall disclose information in the "water conservancy construction market supervision platform" (if the information is not disclosed or the documents attached to the bidding documents are inconsistent with the information disclosure content, the bid shall be rejected) and provide the proof materials of paying social insurance on time in the past three months,And have a valid labor contract。The newly hired personnel shall be counted from the date of appointment, and the time of issuance shall not be earlier than the time of announcement;

2.3Have good business reputation and sound financial accounting system: provide good business reputation commitment letter to bidder2020 2021 2022The annual financial position is good, no property has been taken over in frozen condition, provided 2020 2021 2022The annual financial report audited by an accounting firm shall be issued and the credit certificate issued by the basic bank for the period of validity shall be issued)  

2.4 Reputation requirements:

2.4.1Bribery Bribery and unfair competition acts and bad behavior of good faith records: bribery bribery and unfair competition acts (inquiry channel: China Judgment Documents networkhttp://wenshu.court.gov.cn/And good faith record bad behavior (query channel: National construction market supervision public service platformhttp://jzsc.mohurd.gov.cn/), the bidder with bribery, unfair competition and bad integrity record is refused to participate in the project bid (the inquiry object includes: enterprise, legal representative and project manager/Project Director)。

2.4.2The project will refuse to participate in the bidding activities of the project for those who are included in the record list of dishonest persons, major tax law and dishonest subjects and government procurement serious illegal and dishonest behaviors;【 Inquiry channel: China Executive Information Disclosure Network (http://zxgk.court.gov.cn/shixin/Query the person subject to enforcement for breach of trust, "Credit China" website (www.creditchina.gov.cnQuery major tax violations and dishonest subjects, China Government Procurement website (www.ccgp.gov.cn) Query the list of records of serious illegal and dishonest behaviors in government procurement 】。Provide screenshots of web queries (which must be attached to the tender documents at the time of bid opening);The bid inviter has the right to review the credit of the bidder,The bidder is found to have credit problems during the period from the registration to the signing of the contract with the tenderer,The tenderer has the right to cancel its qualification for winning the bid (the object of inquiry includes: enterprise, legal representative, project manager/Project Director)。The query time cannot be earlier than the announcement time。

2.5The person in charge of the unit is the same person or different units with holding and management relations, and shall not participate in the bidding and procurement activities under the same contract (provide the screenshot of the company information, shareholders or investors information publicized in the "National Enterprise Credit Information Publicity System" with the official seal of the unit)。

2.6 The project does not accept joint bids, and no subcontracting or subcontracting is allowed。

2.7 Potential bidders can only bid for one of the above multiple bid sections, and are not allowed to bid for multiple bid sections。

3. Bid opening time202401310930分;

Bid evaluation time202401311150分;

Calibration time202402071030分;

List of members of the bid evaluation Committee:Zhao Shousheng, Wang Yan, Zhang Yuechun, Xu Sanying, Zhu Pengzhen

List of members of the Bidding Committee:Li Yonggan, Li Zhihui, Ma Ningning

5. Verify information

After verification: The first bid section: the candidates who passed the verification: Guihong Construction Development Co., LTD., Shuanghong Construction Development Co., LTD., Yu Ming Construction Co., LTD。Candidates who failed to pass the verification: Henan Tenghua Construction Engineering Co., LTD. : There is no quality standard in the quality management system and control measures, which does not meet the requirements of the bidding documents;

The second bid section: the candidates who passed the verification of the bid: Sunwin Construction Group Co., LTD., Henan Jincai Construction Engineering Co., LTD., Henan Yiguang Construction Engineering Co., LTD。Shortlisted candidates who did not pass the verification:Henan Yuancheng Weiye Construction Co., LTD., the basis for the plan preparation in the construction organization design has been cancelled;The construction schedule and the network plan are contradictory and do not meet the construction requirements of the project。Henan Lushui Construction Engineering Co., LTD., the construction schedule and network plan in the construction organization design were expressed incorrectly and did not meet the project construction requirements。Xuchang Jintai Construction Engineering Co., LTD. : The service commitment in the bidding document was not signed and sealed in accordance with the requirements of the bidding document。

Section 3:Candidates who passed the verification: Henan Hua 'an Water Conservancy Engineering Co., LTD., Henan Shenglian Municipal Engineering Co., LTD., Henan Yuting Geotechnical Engineering Co., LTD。Shortlisted candidates who did not pass the verification:Henan Suman Construction Engineering Co., LTD., the authorized client's social security inquiry date does not meet the requirements of this project。Henan Zhongzhou Water Conservancy Engineering Co., LTD. : The project progress plan and measures in the construction organization design are inconsistent with the construction schedule and network plan, and the schedule and measures do not meet the requirements。Journey Construction Co., LTD. : The information of the technical director was filled in incorrectly。

Section 4:Candidates who passed the verification: Henan Golden Eagle Construction Group Co., LTD., Henan Jingpeng Construction Engineering Co., LTD., Henan Zhuosheng Water Conservancy Engineering Co., LTD。Shortlisted candidates who failed the verification: none。

Section 5:Candidates who passed the verification: Henan Qingfeng Construction Co., LTD., Henan Chunxiao Construction Engineering Co., LTD., Henan Yinxi Construction Engineering Co., LTD。Shortlisted candidates who failed the verification: none。

Section 6: Candidates who have passed the verification:Henan Macon Construction Engineering Co., LTD., Henan Xufeng Construction Engineering Co., LTD., Henan Jiangyuan Water Conservancy and Hydropower Engineering Co., LTD。Failed to pass the verification of the candidate: Henan Xiangying Municipal Engineering Co., LTD. : The project manager information in the bid letter is wrong。

The seventh bidding section: the candidates who passed the verification: Jiangsu Yutian Engineering Consulting Group Co., LTD., Henan Haina Construction Management Co., LTD., Shousheng International Engineering Consulting Group Co., LTD。Shortlisted candidates who did not pass the verification:Henan Xingshui Project Management Co., LTD. : The date of authorized client's social security inquiry does not meet the requirements of this project;In the appendix of the bid letter, the project director's ID number is not filled in。Gao Da Construction Management Development Co., LTD. : The safety officer post certificate was not signed, and the main contents of the supervision work were not satisfied with the requirements of this project。Zhongrui Jianyuan Engineering Management Co., LTD. : Ensure that the supervision measures of the side station are not targeted;In the process of investment control supervision, the control of advance payment is complete, but the control of construction progress payment is incomplete.Safety control supervision work procedures, put the construction unit for review and processing, do not meet the requirements。Zhongke Huayu Engineering Consulting Co., LTD. : Supervision outline guarantee side supervision measures,The location (process) of the side station is not reasonable with this project,incomplete,Lack of concrete pile,The side station of the purchased beam plate;The national construction market supervision public service platform inquiry integrity record bad behavior,The inquiring legal representative (Wang Xiaojing) and the legal representative on the business license (Zhou Huipeng) are not the same person。

6. The winning bidder

Section 1: Pile number10+992~11+664Riverbank protection project, reconstruction of Weizhuang South Bridge, river construction waste removal。

Full name of the winning bidder:Yu Ming construction Co., LTD

Qualifications and Abilities:Water conservancy and hydropower project construction general contracting level II

Tender offer:3139526.55

    期:180Calendar day

Quality requirements: Qualified

Project Manager:Kong Weichuang

Certificate number: Yu2412022202304201

Section 2: Pile number10+232~10+992Revetment project, reconstruction of Sunzhuang South Bridge, river construction waste removal。

Full name of the winning bidder:Henan Jincai construction Engineering Co., LTD

Qualifications and Abilities:Water conservancy and hydropower project construction general contracting level II

Tender offer:2739453.31

    期:180Calendar day

Quality requirements: Qualified

Project Manager:Feng Nana

Certificate number: Yu 241151711358

Section 3: soil dredging6+610~10+232Reconstruction of Guozhuang South Bridge, reconstruction of Guozhuang Southeast Bridge, new Huanggang West Bridge, river construction waste removal。

Full name of the winning bidder:Henan Shenglian Municipal Engineering Co., LTD

Qualifications and Abilities:Water conservancy and hydropower project construction general contracting level II

Tender offer:2862450.57

    期:180Calendar day

Quality requirements: Qualified

Project Manager:Niu Hongjie

Certificate number: Yu 241161696639

Section 4:6+142~6+610Revetment project, reconstruction of Huanggang South Bridge, river construction waste removal。

Full name of the winning bidder:Henan Zhuosheng water Conservancy Engineering Co., LTD

Qualifications and Abilities:Water conservancy and hydropower project construction general contracting level II

Tender offer:2988020.51

    期:180Calendar day

Quality requirements: Qualified

Project Manager:侯杰

Certificate number: Yu 241181834285

Section 5: Earth dredging (0+00~6+142New Zhuanglin village flood sluice, rebuild Lufang village1Bridge, new furnace house village2桥。

Full name of the winning bidder:Henan Qingfeng construction Co., LTD

Qualifications and Abilities:Water conservancy and hydropower project construction general contracting level II

Tender offer:2678559.45

    期:180Calendar day

Quality requirements: Qualified

Project Manager:王红

Certificate number: Yu241181941464

Section 6: Rebuild Liangzhuang control Gate, rebuild Lufang village3桥。

Full name of the winning bidder:Henan Jiangyuan Water Conservancy and hydropower Engineering Co., LTD

Qualifications and Abilities:Water conservancy and hydropower project construction general contracting level II

Tender offer:2660086.27

    期:180Calendar day

Quality requirements: Qualified

Project Manager: Wang Pengwei

Certificate number: Yu 241171712824

Section 7: Project supervision

Full name of the winning bidder:Henan Haina construction management Co., LTD

Qualifications and Abilities:Water conservancy construction supervision grade B, project supervision comprehensive qualification

Tender offer:516500.00

Service term: with the construction period and defect liability period

Quality requirements: Qualified

Project Director:Zhangxiang fruit

Certificate Number:2210010787

Vii. Announcement Time:20240209日 至20240211日(3日);

Viii. Channels and methods for raising objections:

According to the BianPublic Administration Office (202013The document provides that if the bidder has objections to the above results, it can raise objections to the tenderer on the public resources trading information network cable of Kaifeng City during the result announcement period, and the overdue will no longer be accepted, and the tenderer shall receive the objections from the date of receipt3Reply within days,If the opposing party still has objections to the reply or the tenderer fails to reply within the prescribed time, the opposing party may start from the date of announcement of the result10Within days (objection reply period does not count) in the Kaifeng public resources trading information network online complaint。(In the column of important documents on this website, there are text formats and requirements for objections and complaints of construction projects)

9. Contact information

Tenderer: Qi County small and medium-sized river management Project construction Administration

Contact: Mr. Zhu

Contact information:0371-28992399

   Address: Ximen Street, Qixian County, Kaifeng City 112

    Said: Credit investment China Enterprise Management (Henan) Co., LTD

Contact: Ms. Liu

Contact information:0371-22050733

    Address: Zhengkai Avenue, Kaifeng Area, Henan Pilot Free Trade Zone296No. Free trade big

Supervision unit: Qi County Finance Bureau Procurement Office

电话:0371-28666979

Kaifeng water Resources Bureau

Contact number:0371-23853218

10. Publishing media

This result announcement is in"China Tendering and Bidding Public Service Platform", "Henan Provincial Government Procurement Website", "Kaifeng Public Resources Transaction Information Network"Publish on...。

 


All rights reserved:Kaifeng city public resources trading information networkHost: Kaifeng public resources trading information network
Address: Kaifeng City citizens home 5th floor 邮编:475000 Email: kfggzyjyzx2018@163.com Website record number:Yu ICP prepared No. 12001764-1

Technical support:Zhengzhou Xinyuan Information Technology Co., LTD